PureWood 50 — wooden prefab houses in Tenerife | CasaModul
    Popular

    PureWood 50

    Family wooden house of 50 m² with two bedrooms. Structural panels, open-plan layout.

    desde 70.000 €

    Specifications

    Floor area50 m²
    Bedrooms2
    Bathrooms1
    MaterialLaminated timber
    Wall thickness200 mm

    PureWood 50 adds the second bedroom without moving up a price bracket per square metre: 50 m² with an open-plan layout where kitchen, dining and living share one volume and both bedrooms sit on the opposite side. This is the step from a home for a couple to a home for a small family.

    Who it suits

    • A couple with one child, or a couple who need a separate study
    • A year-round, everyday home
    • Long-term rental — two bedrooms is the most sought-after format

    Compared with the rest of the range

    ModelSizeBedroomsFrom
    PureWood 3535 m²149.000 €
    PureWood 50 (This model)50 m²270.000 €
    PureWood 100100 m²3140.000 €

    Construction and materials

    Sandwich panel construction: 12 mm OSB outside, 200 mm of insulation and 9 mm OSB inside, for a total wall thickness of 200 mm. That combination is what delivers the thermal and acoustic insulation, and the resistance to Canarian humidity.

    What the project includes

    The price covers the complete structure assembled on your plot: walls, floor, roof and ceiling, with thermal insulation and the electrical and plumbing first fix — the outlets and routes left ready. Final finishes (skimming, plastering and paint), the definitive electrical and water installation, the kitchen, sanitary ware, the windows and doors and the foundations are quoted separately, because every plot and every client starts from different conditions. You choose the joinery — from basic PVC to floor-to-ceiling aluminium sliders — and we fit it. We also guide you through the technical documentation and the building permit, which is mandatory in the Canaries for a permanent home.

    Lead time and assembly

    Workshop manufacturing: 30 to 60 days. On-site assembly: 4 to 6 weeks depending on size and complexity. Two to three months in total, from order to handover.