MonoLine 100 — wooden glulam timber houses in Tenerife | CasaModul

    MonoLine 100

    Spacious 100 m² solid timber house with a mono-pitch roof. Three bedrooms, maximum comfort.

    desde 150.000 €

    Specifications

    Floor area100 m²
    Bedrooms3
    Bathrooms2
    MaterialGlued laminated timber
    Wall thickness100 mm

    MonoLine 100 takes solid timber construction up to family scale: 100 m², three bedrooms, two bathrooms. It is the most expensive project in the catalogue for a concrete reason — 100 m² of solid glulam wall is a volume of material the panel ranges simply don't match.

    Who it suits

    • A main residence for a family that wants solid timber, not panels
    • An architect-led house on a plot with views, where the interior finish is the project
    • Mixed use — home plus a practice or studio with its own entrance

    Compared with the rest of the range

    ModelSizeBedroomsFrom
    MonoLine 3535 m²152.500 €
    MonoLine 6060 m²290.000 €
    MonoLine 100 (This model)100 m²3150.000 €

    Construction and materials

    Solid 100 mm glued laminated Nordic pine walls. The timber is kiln-dried and treated at the factory, which eliminates later shrinkage and warping. The façade can be left natural or clad.

    What the project includes

    The price covers the complete structure assembled on your plot: walls, floor, roof and ceiling, with thermal insulation and the electrical and plumbing first fix — the outlets and routes left ready. Final finishes (skimming, plastering and paint), the definitive electrical and water installation, the kitchen, sanitary ware, the windows and doors and the foundations are quoted separately, because every plot and every client starts from different conditions. You choose the joinery — from basic PVC to floor-to-ceiling aluminium sliders — and we fit it. We also guide you through the technical documentation and the building permit, which is mandatory in the Canaries for a permanent home.

    Lead time and assembly

    Workshop manufacturing: 30 to 60 days. On-site assembly: 4 to 6 weeks depending on size and complexity. Two to three months in total, from order to handover.