MonoLine 60 — wooden glulam timber houses in Tenerife | CasaModul
    Popular

    MonoLine 60

    Family solid timber house of 60 m² with a mono-pitch roof. Two bedrooms, open-plan layout.

    desde 117.000 €

    Specifications

    Floor area60 m²
    Bedrooms2
    Bathrooms1
    MaterialGlued laminated timber
    Wall thickness100 mm

    MonoLine 60 is the most requested model in the solid timber range: 60 m² with two bedrooms and an open living area under the mono-pitch roof. The point where the house stops feeling compact without reaching the cost of a large home.

    Who it suits

    • A permanent home for two or three people
    • A rural rental with character, where exposed timber is the selling point
    • Replacing an older building on an already serviced plot

    Compared with the rest of the range

    ModelSizeBedroomsFrom
    MonoLine 3535 m²168.250 €
    MonoLine 60 (This model)60 m²2117.000 €
    MonoLine 100100 m²3195.000 €

    Construction and materials

    Solid 100 mm glued laminated Nordic pine walls. The timber is kiln-dried and treated at the factory, which eliminates later shrinkage and warping. The façade can be left natural or clad.

    What the project includes

    The price covers the complete structure assembled on your plot: walls, floor, roof and ceiling, with thermal insulation and the electrical and plumbing first fix — the outlets and routes left ready. Final finishes (skimming, plastering and paint), the definitive electrical and water installation, the kitchen, sanitary ware, the windows and doors and the foundations are quoted separately, because every plot and every client starts from different conditions. You choose the joinery — from basic PVC to floor-to-ceiling aluminium sliders — and we fit it. We also guide you through the technical documentation and the building permit, which is mandatory in the Canaries for a permanent home.

    Lead time and assembly

    Project preparation: approximately 1 week. Workshop manufacturing: around 1 week. On-site assembly of the structure: around 2 weeks. Foundations are scheduled separately and take from 1 week to 1 month, depending on the ground and chosen solution. These are indicative times; permits, production availability, transport, finishes and services are agreed for each project.

    Once dispatched from the workshop, transport usually takes 3–4 hours on the same island or one day to another Canary Island. Manufacturing and on-site assembly are separate stages.